Details of Award
NERC Reference : NER/T/S/2003/00110
Settling behaviour of sand through a non-Newtonian colloidal mud suspension: Implications for turbidity current motion and turbidite deposition.
Grant Award
- Principal Investigator:
- Professor P Talling, University of Bristol, Earth Sciences
- Co-Investigator:
- Professor J Peakall, University of Leeds, School of Earth and Environment
- Co-Investigator:
- Professor AJ Hogg, University of Bristol, Mathematics
- Co-Investigator:
- Professor RB Wynn, National Oceanography Centre, Science and Technology
- Grant held at:
- University of Bristol, Earth Sciences
- Science Area:
- Marine
- Earth
- Overall Classification:
- Marine
- ENRIs:
- Pollution and Waste
- Natural Resource Management
- Environmental Risks and Hazards
- Science Topics:
- Pollution
- Sediment/Sedimentary Processes
- Geohazards
- Abstract:
- Deposition in many Ocean Margin settings involves settling of non-cohesive grains ('sand') through a non-Newtonian suspension of colloidal ('mud') particles. Although sand or mud-only settling is well constrained, combined sand-mud settling is poorly understood. Complex particle interactions ensure sand-mud settling is not simply the addition of individual sand and mud settling behaviour. Novel experiments will develop a better understanding of sand-mud settling dynamics in the context of submarine turbidity currents, in order to predict lateral variations in mud-content and reservoir quality of their deposits (turbidites). Many of the World's largest petroleum reservoirs occur within turbidites. Results will also aid prediction of pollutant flux to the sea-floor in diverse marine settings, as pollutants are preferentially incorporated onto mud particles.
- Period of Award:
- 1 Apr 2004 - 31 Mar 2007
- Value:
- £89,668 Lead Split Award
Authorised funds only
- NERC Reference:
- NER/T/S/2003/00110
- Grant Stage:
- Completed
- Scheme:
- Directed Pre FEC
- Grant Status:
- Closed
- Programme:
- Ocean Margins LINK
This grant award has a total value of £89,668
FDAB - Financial Details (Award breakdown by headings)
Total - Staff | Total - T&S | Total - Other Costs | Total - Equipment | Total - Indirect Costs |
---|---|---|---|---|
£22,280 | £9,701 | £37,869 | £9,568 | £10,249 |
If you need further help, please read the user guide.