Details of Award
NERC Reference : NER/T/S/2002/00228
Ecological significance of surface and subsurface exchange in lowland channels.
Grant Award
- Principal Investigator:
- Professor M Trimmer, Queen Mary University of London, Sch of Biological and Chemical Sciences
- Co-Investigator:
- Professor A Hildrew, Queen Mary University of London, Sch of Biological & Behavioural Sciences
- Co-Investigator:
- Professor JI Jones, Queen Mary University of London, Sch of Biological & Behavioural Sciences
- Co-Investigator:
- Dr J Schmid-Araya, Queen Mary University of London, Sch of Biological and Chemical Sciences
- Science Area:
- Freshwater
- Overall Classification:
- Freshwater
- ENRIs:
- Pollution and Waste
- Natural Resource Management
- Science Topics:
- Biogeochemical Cycles
- Ecosystem Scale Processes
- Hydrological Processes
- Community Ecology
- Abstract:
- LOCAR seeks to understand surface-subsurface exchange in permeable catchments from a biological perspective. We will combine measurements of nutrient pools (N & P) and a characterisation of isotopic signatures of the available N and seasonal biomass (primary and secondary production) with an assessment of biogeochemical function through -gas profiles (CO2, CH4 and N2O), porewater nutrients and stable isotope tracers (15NO3-) within exchange patches. Primarily we aim to assess how patch configuration affects retention, hyporheic biogeochemical processes and, in turn, the bio-availability of nutrients to production and whether seasonal variations in abundance of production correlates with biogeochemical function. In addition, provide data for a hydrogeochemical modelling effort to improve prediction of hydrochemical and nutrient function in permeable lowland catchments.
- NERC Reference:
- NER/T/S/2002/00228
- Grant Stage:
- Completed
- Scheme:
- Directed Pre FEC
- Grant Status:
- Closed
- Programme:
- Lowland Catchment Research
This grant award has a total value of £239,966
FDAB - Financial Details (Award breakdown by headings)
Total - Staff | Total - T&S | Total - Other Costs | Total - Equipment | Total - Indirect Costs |
---|---|---|---|---|
£122,579 | £12,346 | £16,508 | £20,653 | £67,879 |
If you need further help, please read the user guide.