Details of Award
NERC Reference : NER/O/S/2002/01010
Initiation of precipitating convection in a maritime environment
Grant Award
- Principal Investigator:
- Professor A Blyth, University of Reading, Meteorology
- Co-Investigator:
- Dr RJ Watson, University of Bath, Electronic and Electrical Engineering
- Co-Investigator:
- Professor D Parker, University of Leeds, National Centre for Atmospheric Science
- Co-Investigator:
- Professor P Watson, University of Bath, Electronic and Electrical Engineering
- Co-Investigator:
- Professor AJ Illingworth, University of Reading, Meteorology
- Co-Investigator:
- Professor C Collier, University of Leeds, School of Earth and Environment
- Co-Investigator:
- Professor G Vaughan, The University of Manchester, Earth Atmospheric and Env Sciences
- Co-Investigator:
- Professor S Mobbs, University of Leeds, National Centre for Atmospheric Science
- Co-Investigator:
- Professor MW Gallagher, The University of Manchester, Earth Atmospheric and Env Sciences
- Co-Investigator:
- Dr D Bebbington, University of Essex, Computer Sci and Electronic Engineering
- Grant held at:
- University of Reading, Meteorology
- Science Area:
- Atmospheric
- Overall Classification:
- Atmospheric
- ENRIs:
- Environmental Risks and Hazards
- Science Topics:
- Water In The Atmosphere
- Hydrological Processes
- Climate & Climate Change
- Abstract:
- This proposal is concerned with research aimed at understanding the mechanisms responsible for the initiation of precipitating convection; i.e. why convective clouds form and develop into precipitating clouds in a particular location. There are a number of aspects to this problem requiring a combination of multifaceted observations and modelling. We propose to conduct a field campaign over southern England during the summer of 2004 in Phase 1 of this project and to use the results of the field campaign in Phase 2 to improve understanding of the processes involved and to evaluate and improve the performance of high resolution models and data assimilation techniques
- Period of Award:
- 1 Jan 2004 - 31 Dec 2007
- Value:
- £279,406 Split Award
Authorised funds only
- NERC Reference:
- NER/O/S/2002/01010
- Grant Stage:
- Completed
- Scheme:
- Consortiums Pre FEC
- Grant Status:
- Closed
- Programme:
- Consortiums
This grant award has a total value of £279,406
FDAB - Financial Details (Award breakdown by headings)
Total - Staff | Total - T&S | Total - Other Costs | Total - Indirect Costs |
---|---|---|---|
£140,057 | £19,739 | £55,182 | £64,427 |
If you need further help, please read the user guide.