Skip to content
Natural Environment Research Council
Grants on the Web - Return to homepage Logo

Details of Award

NERC Reference : NER/N/S/2002/00753

Mustard gas contaminated soil - understanding the mechanisms and parameters governing contaminant behaviour and biodegradation.

Grant Award

Principal Investigator:
Professor I Thompson, NERC CEH (Up to 30.11.2019), NERC CEH - Oxford
Co-Investigator:
Professor MJ Bailey, UK Centre for Ecology & Hydrology, Directors and Science Coordinators
Co-Investigator:
Dr S Jackman, University of Oxford, Earth Sciences
Co-Investigator:
Professor C Knowles, University of Oxford, Engineering Science
Science Area:
Terrestrial
Overall Classification:
Terrestrial
ENRIs:
Pollution and Waste
Environmental Risks and Hazards
Biodiversity
Science Topics:
Environmental Microbiology
Pollution
Technol. for Environ. Appl.
Environmental biotechnology
Abstract:
Mustard gas contaminated soil contains a toxic micture of mustard and its derivatives, thiodiglycol, dithiane, thioxane and sulfonium ion polymers, that has changed little over decades of contamination. The soil contains indigenous bacteria that have adapted to tolerate and degrade these compounds. By elucidating the diversity and functionality of these populations, coupled with chemical analysis and assessment of site parameters, we will construct a model (physical, chemical and microbiological properties) to determine the potential for microbial degradation. This information will be used to identify the chemcial and biological processess that affect contaminants and target manipulations to optimise microbial degradation. This information can be incorporated into a risk-based framework, with the potential for long-term management or intervention (remediation).
Period of Award:
1 Jun 2003 - 31 May 2006
Value:
£207,980
Authorised funds only
NERC Reference:
NER/N/S/2002/00753
Grant Stage:
Completed
Scheme:
Directed Pre FEC
Grant Status:
Closed

This grant award has a total value of £207,980  

top of page


FDAB - Financial Details (Award breakdown by headings)

Total - StaffTotal - T&STotal - Other CostsTotal - EquipmentTotal - Indirect Costs
£93,717£4,176£43,978£23,000£43,110

If you need further help, please read the user guide.