Skip to content
Natural Environment Research Council
Grants on the Web - Return to homepage Logo

Details of Award

NERC Reference : NE/S005951/1

BOULDER: Accounting for BOUlders in Landslide-flood Disaster Evaluation and Resilience

Grant Award

Principal Investigator:
Dr GL Bennett, University of East Anglia, Environmental Sciences
Co-Investigator:
Dr A Franco, University of East Anglia, Environmental Sciences
Science Area:
Earth
Freshwater
Terrestrial
Overall Classification:
Unknown
ENRIs:
Environmental Risks and Hazards
Global Change
Natural Resource Management
Science Topics:
Landslides
Earth Engineering
Flood risk
Hazard warning systems
Risk analysis
Risk management
Geohazards
Sediment transport
Hydrological Processes
Remote Sensing & Earth Obs.
Technol. for Environ. Appl.
Abstract:
Landslides and floods are globally occurring natural hazards that pose a significant threat to human life and sustainable development. The most severe losses due to landslides occur in the less economically developed countries of Asia and South America, particularly in those with mountainous topography, earthquakes and monsoonal climates. Landslides and rockfalls in these regions often detach fractured bedrock and deliver large boulders downslope that block roads, destroy buildings and kill people. On entering the river channel network, boulders may be bulldozed by large floods and block hydropower infrastructure, jeopardizing electricity supply and the economy. Thus, boulders may cause a cascade of hazards. This project addresses specific landslide and flood risk management problems brought to our attention by stakeholders impacted by boulders in the Upper Bhote Koshi catchment in Nepal, one of the most landslide and flood-prone countries in the world. This project also addresses a lack of data and scientific understanding of (i) boulder production on hillslopes (e.g. by landslides), (ii) boulder transport in floods. In this two year project, an inter-disciplinary team of researchers will work closely with project partners to (1) map boulders and investigate the controls on boulder production on hillslopes by landslides and rockfalls, (2) develop a new real-time GPS boulder tracking system with which to improve understanding of boulder movement in floods and monitor hazardous boulders (3) engage with stakeholders to incorporate findings into disaster management plans and ultimately to increase resilience to landslide and flood hazards. The project will focus on the Upper Bhote Koshi (UBK) catchment to the north east of Kathmandu, Nepal, and has been designed with specific end users in mind in the UBK that are dealing with boulder hazards related to landslide and floods. This area is particularly vulnerable to boulder hazards as it is the main road link between Nepal and China and contains several major hydroelectric power plants including the Upper Bhote Koshi Hydroelectric Power plant (UBKHEP). The catchment encapsulates the multitude of natural hazards faced by Nepal. In 2015 the catchment was shaken by the Gorkha earthquake generating some of the highest densities of landsliding anywhere in Nepal. In July 2016, a complex monsoon flash flood entrained extremely large boulders (>8 m) some of which became jammed in the sluice gates of the UBKHEP culminating in more than $110 m damage to the power station. The power station remains closed resulting in lost revenue and compromising Nepal's energy supply. As the power company rebuilds and a further hydroelectric power station is built just downstream, it will be vital to properly account for future boulder hazards in landslide and floods. The project brings together an interdisciplinary team of researchers based in the UK, Germany and Nepal with several project partners that have helped to define the problems that this project will address. The boulder hazard map and boulder tracking system developed in this research will help make the Bhote Koshi Power Company and wider hydropower industry more resilient to landslide and flood hazards. The research will also benefit organizations managing transport infrastructure and communities living on steep, landslide prone hillslopes in the Bhote Koshi. We will hold two project workshops bringing together project partners and relevant stakeholders from industry, local communities and government institutions with the help of Practical Action Consulting Nepal, to research boulder hazard perception and enhance uptake of this research into risk management practice at local and national governance level and ultimately to aid development in Nepal and South Asia.
Period of Award:
1 Oct 2018 - 31 Oct 2019
Value:
£252,872
Authorised funds only
NERC Reference:
NE/S005951/1
Grant Stage:
Completed
Scheme:
Directed - International
Grant Status:
Closed
Programme:
SHEAR

This grant award has a total value of £252,872  

top of page


FDAB - Financial Details (Award breakdown by headings)

DI - Other CostsIndirect - Indirect CostsDA - InvestigatorsDI - StaffDA - Estate CostsDI - T&SDA - Other Directly Allocated
£32,981£75,058£15,708£83,282£20,362£23,968£1,514

If you need further help, please read the user guide.