Skip to content
Natural Environment Research Council
Grants on the Web - Return to homepage Logo

Details of Award

NERC Reference : NE/J01401X/1

Predicting the ecological consequences of mega hydroelectric dams on vertebrate assemblages in lowland tropical forests

Grant Award

Principal Investigator:
Professor C Peres, University of East Anglia, Environmental Sciences
Science Area:
Atmospheric
Earth
Freshwater
Marine
Terrestrial
Overall Classification:
Terrestrial
ENRIs:
Biodiversity
Environmental Risks and Hazards
Global Change
Natural Resource Management
Pollution and Waste
Science Topics:
Community Ecology
Conservation Ecology
Population Ecology
Energy - Conventional
Environmental Planning
Abstract:
The construction of major hydroelectric dams is one of the most important current drivers of habitat loss in lowland tropical forests, where the ratio of megawatts of hydropower produced per unit of flooded area is notoriously low. At least 662,000 ha of primary forests were inundated by the nine mega-hydroelectric dams constructed to date across the Brazilian Amazon, and 10 additional major dams will be built by 2022. The hydroelectric energy sector promotes widespread erosion of forest fauna and flora due to conversion of large tracts of forest into islands embedded within a unsuitable freshwater matrix and high deforestation rates throughout the neighbouring reservoir areas. Given escalating investments in hydropower, assessing the effects of mega-dams on forest biodiversity persistence has become a high research priority in tropical forest conservation. The environmental impact of the Balbina Hydroelectric Dam (BHD) in the Central Amazon has been widely considered to be disastrous; <50% of the estimated power supply at the time of construction (1986) is now generated at the expense of 236,000ha of continuous forests that were reduced to an archipelago of ~3,500 islands. However, this experimental landscape provides a unique opportunity to examine biotic responses to habitat fragmentation and isolation. In addition to the long-term relaxation time, the Balbina Dam presents several advantages compared to other fragmented landscapes including a large number of replicate islands, a homogeneous habitat matrix, effective protection from logging and hunting, and partial logistical support from the Uatum? Biological Reserve which manages the reservoir area. Here, we propose to examine how both terrestrial and arboreal vertebrate populations (mammals, birds and reptiles) respond to drastic post-isolation alteration in landscape structure in the Balbina reservoir, and the synergistic interaction of forest disturbance and forest isolation. Quantitative surveys will be conducted at 32 sites using a combination of seven sampling techniques: line-transect censuses, point-counts, camera trapping, track-surveys, enclosed track stations, armadillo burrow counts, and automated digital recordings of the diurnal and nocturnal fauna. Patterns of species persistence and community structure will be quantified and related to habitat structure and composition (forest basal area, canopy gap fraction, canopy height, understorey density, density of live/dead trees and floristic diversity) and different patch and landscape metrics (island size, shape, isolation, land cover). Forest canopy fracture will be assessed using digital hemispherical photographs coupled with high resolution satellite images. This study will document the patterns of local extinction in vertebrate assemblages within a true lacustrine island system and predict species richness and composition across the entire Balbina archipelago using modified species-area relationships. Using an 'analytical toolkit', results from this study will also inform pre-construction environmental impact assessments and licensing standards of planned hydroelectric dams projected for other Amazonian river basins, provided that the dam location and maximum water-level are known and digital elevation (DE) data for the upstream flooded area can be made available. This will allow the development of a predictive framework with which the tradeoffs between hydropower generation and biodiversity erosion can be evaluated for a range of proposed hydroelectric dam project sites.
Period of Award:
26 Mar 2012 - 25 Sep 2013
Value:
£50,852
Authorised funds only
NERC Reference:
NE/J01401X/1
Grant Stage:
Completed
Scheme:
Small Grants (FEC)
Grant Status:
Closed
Programme:
Small Grants

This grant award has a total value of £50,852  

top of page


FDAB - Financial Details (Award breakdown by headings)

DI - Other CostsIndirect - Indirect CostsDA - InvestigatorsDA - Estate CostsDA - Other Directly AllocatedDI - T&S
£35,341£2,166£4,260£747£65£8,274

If you need further help, please read the user guide.